- Product
Bin Filling Structure
The existing bin filling structure had reached the end of its working life and needed to come down. We handled the whole job from start to finish: removing the old structure, engineering and fabricating a new one in our shop, then transporting it to site for assembly and installation. Once the new structure was standing, we re-installed the customer’s bin filling equipment
so they were back up and running without having to bring in a second contractor.
Project Overview
- Removal of the existing bin filling structure
- Design, build and engineering of the new structure
- Transport, assembly and on-site installation
- Re-installation of the bin filling equipment
Project Gallery