Kent Bridge Phase 2- Capital Project

Fabmaster delivered a full-scale capital project at the Kent Bridge facility, handling everything from the removal of existing equipment through the design, fabrication, and installation of an entirely new grain handling system. This phase brought significant added capacity and reliability to the site, integrating high-throughput legs, gathering conveyors, and a complete air- handling and spouting package into one cohesive system.

Project Overview

  • Removed existing equipment to prepare the site for the new installation
  • Designed, fabricated, and installed twin 7,500 Bu./Hr. wet leg and dry leg units
  • Added a 4,000 Bu./Hr. transfer leg to move product between processes
  • Installed a 7,500 Bu./Hr. silo gathering conveyor and a 7,500 Bu./Hr. main gathering conveyor
  • Fabricated custom silo unload slides suited to the facility’s layout
  • Supplied and installed two custom aspirators, two cyclones, and all associated ducting
  • Completed the system with spouting, valves, cushion boxes, and all supporting accessories